Two more Water Bores for the Thames Coromandel District Council
Late in 2004 Browns were commissioned to drill two new water bores and deepen an existing bore in the beautiful Coromandel Peninsular.
Onemana 200mm cased bore producing 143m3/hr
Hahei 100mm bore producing 16m3/hr
Plus the deepening of an existing 150mm bore at Wentworth Valley in Whangamata.
 |
RIG 9 UDR 650 MKII at Hahia |
|
 |
RIG 7 INGERSOLL RAND TH60 at Onemana |